Requirement
Owners of commercial buildings face high energy and maintenance costs that are hard to break down and control, technical systems that run separately and inconsistently, and the need to keep tenants and assets safe 24/7.
Scope
- Building management system on a digital twin: a 3D model of the building shows data from its technical systems.
- Central operations centre: one screen for power, air conditioning, lighting, cameras, access control and parking.
- Predictive maintenance and simulation of operations before changes are applied.
- Standard incident procedures at the operations centre, shortening response time.

Results
- Maintenance costs reduced by 50%.
- Operating efficiency increased by 30%.











